October 28, 2026: New proposed location map has been added to the Project Location tab.
September 23, 2026: Intrepid Fiber continues to explore service locations within the City of Citrus Heights and surrounding areas. Currently, door tags are being distributed by two of their subcontractors, ITG Communications and Utilities One, advising residents of surveying in the area. Some locations may require access to pre-existing poles in residents back yards. A sample door tag could look like this.
Please call the General Services Department at 916-727-4770, if you have any questions or concerns.
Intrepid Fiber will be installing fiber cable to bring internet to homes and businesses in the City of Citrus Heights. Their contractors will be working in the public right of way or in existing public utility easements (PUEs).
The fiber will be installed by micro-trenching in the public right of way, or by attaching to existing utility poles. After the construction is complete, Intrepid is required to restore any disturbed areas to previous conditions or better.
Utility or Sidewalk easements may exist on private property adjacent to the right-of-way. Utility easements grant the rights for utilities such as gas, electric and communication lines, such as fiber optic cables, to be located on private property within the easement area.
Below is a map depicting where in the improvements are expected to take place.
- Door hangars will be distributed to residents 72 hours prior to active construction. Residents can expect construction between 8:00am and 5:00pm, Monday through Friday, with minimal work after hours and on weekends.
- NOTE: Holiday Moratoriums on Road Work
- *The city’s Arterial Holiday Moratorium prohibits work on arterial streets unless it is an emergency – In effect beginning at 5:00 PM FRIDAY before Thanksgiving until the first business day of January.*
*The city's Residential Holiday Moratorium prohibits work between 5:00 PM the FRIDAY before Christmas until the first business day of January, unless it is an emergency* (for all residential streets)
For more information regarding Intrepid Fiber and similar projects, please visit Intrepid's Website here: https://www.intrepidfiber.com/construction/
- *The city’s Arterial Holiday Moratorium prohibits work on arterial streets unless it is an emergency – In effect beginning at 5:00 PM FRIDAY before Thanksgiving until the first business day of January.*